You would need liquid nails or a similar polyurethane based adhesive but you ll need to test a plank first to make sure the oils from it won t bleed through and discolor your planks.
Liquid nails vinyl plank.
I had some luxury vinyl floor with pad on back of plank.
Also it is possible to nail in some areas but do so using 6d or smaller nails so they aren t too visibly seen.
Will this be a problem.
Nail at easy joist.
Also blocked in crawl space.
Liquid nails cove base stair tread adhesive cb 10 is a water resistant latex based construction adhesive.
We used liquid nails which is a construction adhesive and we got it everywhere.
Vinyl tiles without the adhesive backing are best installed using a paste like mastic similar to thinset used for ceramic tiles.
Some vinyl tiles have a self adhesive backing that is applied directly to the floor.
Pull out that first plank baby.
The installer put one small nail in each plank around the edge l.
I used way too much and when it squirted out it became a mess fast.
It offers quick initial grab without bracing.
I cleaned it up and that about an hour and a gallon of mineral spirits later ok maybe not a gallon but it was a lot.
Interior projects construction adhesive low voc ln 704 lnp 704.
Liquid nails projects construction adhesive ln 704 lnp 704 offers water clean up when wet develops strength rapidly and has excellent water resistance and long term holding power when set.
When laying the planks make sure to keep a 1 4 gap between the vinyl plank flooring and the walls doorways plumbing etc.
Vapor barrier on ground in crawl space.
I think that liquid nails might work but i am afraid you will never be able to get it off so if you ever need to redo the floor make sure the vinyl floor is down perfectly as you will be using it as the base to any other floor you decide to install at a later date.
A bit of liquid nails applied to the floor can add some extra insurance that the tiles will stay in place.
And give it a wee bit of liquid nails encouragement on the backside.
This central board should run across multiple ceiling joists.
And 36 inches of ground is low spot.
Central air and heat.